Tuff Breed® WSP Extreme® Gold Pressure Ring and SandDog® Header Ring Achieve 435-Hour Run for Pressure Pumping Operation

One of the leading Service Providers in the Haynesville Shale contacted CDI regarding the premature failure of the existing well service packing in their pressure pumping operations. The Service Provider was also experiencing related packing bore washouts, unplanned downtime, and increased packing and maintenance costs.  Bottom line: existing well service packing was not meeting the required needs for the long run times and multiple frac stages necessary for the operation and environmental conditions. 

Read the case study to learn how we worked with our partner to solve this significant challenge. 

Read the Case Study

Tuff Breed Solutions

WSP Extreme Series Quick Reference Sheet

Well Service Packing Solutions Brochure

SandDog Header Ring

More Case Studies

dures_XPC-2_Case_Study

Preventing Catastrophic Failure of a Boiler Feed Water Pump
with dures® XPC-2

Custom_materials_blended

A497 and A498 Material Blend Solve Tough Packing Problem On Non-Lube, Bone-Dry Ethylene Transfer Compressors

Learn More

seal_stack_design_accreditation

CDI Seal Stack Design Achieves Lloyds Accreditation for Critical HPHT North Sea Service

Learn More

PEEK_Material_Valve_Design

CDI’s Carbon Fiber Reinforced PEEK Material Selected for New Valve Design

Learn More